the world’s longest tunnel opens in switzerland
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

The world’s longest tunnel opens in Switzerland

Arab Today, arab today

Arab Today, arab today The world’s longest tunnel opens in Switzerland

Italian Prime Minister Matteo Renzi, Swiss Federal President Johann Schneider-Ammann,
Erstfeld - Arab Today

The world’s longest tunnel officially opened on Wednesday, with the trailblazing rail passage under the Swiss Alps aiming to ease transit through the heart of Europe.

With political unity on the continent shaken by a massive influx of refugees and the looming threat of Britain’s European Union (EU) departure, Swiss president Johan Schneider-Amman said the tunnel would “join the people and the economies” of Europe.

He spoke before the 57-kilometre Gotthard Base Tunnel (GBT) made its ceremonial first run with European leaders on board

While the tunnel was entirely funded by non-EU member Switzerland, the bloc’s transport commissioner Violeta Bulc has hailed it as “a godsend” for the continent.

It runs from Erstfeld, in the central canton of Uri, to Bodio, in the southern Ticino canton.

Travel through the Alpine region, by rail or by road, requires taking a zigzag and undulating route.

The Gotthard Base Tunnel was designed to offer a better option for both private travellers and commercial freights.

When the full service opens in December, the tunnel will shave the train journey from Zurich to Milan in northern Italy down to two hours and 40 minutes, roughly an hour less than it currently takes.

It should also make rail freight more efficient — partly by supporting heavier cargo, which should reduce the number of smoke-spewing lorries on the roads, in turn improving traffic and curbing pollution.

The number of daily rail passengers is expected to increase from the current rate of 9,000 people to 15,000 by 2020, according to the Swiss federal railway service.

The rough design for a rail tunnel under the Gotthard Pass was first sketched by Swiss engineer Carl Eduard Gruner in 1947.

But bureaucratic delays, concerns over the cost and other hurdles pushed back the start of construction until 1999.

The work took 17 years at a cost of more than 12 billion Swiss francs (Dh44 billion).

According to the Swiss rail service, it also took 43,800 hours of non-stop work by 125 labourers rotating in three shifts to lay the tunnel’s slab track.

The ambitious venture was largely made possible by technical advances in tunnel-boring machines, which replaced the costly and dangerous blast-and-drill method.

The primary machine used to make the Gotthard tunnel was roughly 410-metres long and functioned like a mobile factory.

It cuts through rock and throws the debris backwards while simultaneously placing the pre-formed segments of concrete that form the shape of the tunnel.

A separate system grouts the pieces together.

With its official opening, the GBT has surpassed Japan’s 53.9-kilometre Seikan tunnel as the world’s longest train tunnel.

The 50.5-kilometre Channel Tunnel that links England and France has been bumped into third place

source : gulfnews

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

the world’s longest tunnel opens in switzerland the world’s longest tunnel opens in switzerland

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

the world’s longest tunnel opens in switzerland the world’s longest tunnel opens in switzerland

 



GMT 11:00 2018 Tuesday ,04 December

The assassination of Ali Abdullah Saleh, one year on

GMT 06:12 2017 Saturday ,07 October

Tabarak Investment infuses Dh500m in Drake & Scull

GMT 10:42 2017 Thursday ,14 December

Casualties as bomber attacks Somalia police academy

GMT 07:43 2017 Friday ,05 May

Russia, Turkey, Iran sign deal

GMT 22:18 2017 Wednesday ,20 September

Oil leak in Kuwait's Ras Al-Zour area

GMT 11:32 2017 Saturday ,15 April

France, Japan aim to land probe on Mars moon

GMT 13:16 2017 Thursday ,09 November

Change of guards ceremony at mausoleum of Allama Iqbal

GMT 07:38 2017 Thursday ,24 August

Bahrain weather forecast

GMT 14:07 2016 Sunday ,23 October

Bombardier to cut another 7500 jobs through 2018

GMT 20:50 2017 Monday ,11 September

Zakat Fund implements Schoolbag Project

GMT 15:12 2017 Monday ,02 January

Lose weight, the natural way — Part 2

GMT 12:56 2017 Tuesday ,21 February

Clashes Between Palestinian & Occupation Forces

GMT 20:07 2017 Tuesday ,19 September

The Perfume Studio launches Design Fragrance

GMT 16:37 2017 Tuesday ,31 October

MP reveals details of Health Insurance

GMT 08:00 2017 Saturday ,11 November

BACA President receives Azerbaijan culture minister

GMT 20:35 2018 Wednesday ,24 October

Suspect packages target Obama, Clintons
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday