desalination plants to run on renewable energy in abu dhabi
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

4 companies awarded contracts for pilot project

Desalination plants to run on renewable energy in Abu Dhabi

Arab Today, arab today

Arab Today, arab today Desalination plants to run on renewable energy in Abu Dhabi

Abu Dhabi Ascent climate change conference
Abu Dhabi - Arab Today

Abu Dhabi Ascent climate change conference Nearly a third of the UAE's greenhouse gas emissions, which are produced by burning conventional fossil fuel, comes from desalination plants. Plans to create these plants running on renewable energy have finally been set in motion by Abu Dhabi's clean energy company Masdar.
The plan was on the drawing board for a year, but on Monday, during the Abu Dhabi Ascent climate change conference, Masdar and its partners for the project, the Environment Agency - Abu Dhabi (EAD) and the Abu Dhabi Water and Electricity Company, announced that four international renewable energy companies have been awarded the contracts for the pilot project. These are Abengoa (Spain), working with a capacity of 1,080 cubic metres of water per day for this project, Degremont (France), with 100 cubic metres, Sidem (France) with 300 cubic metres and Trevi Systems (USA) with 59 cubic metres.
They will start developing clean energy for the trial desalination plant, which is in Ghantoot, on the border between Abu Dhabi and Dubai, immediately.
"Abu Dhabi has the world's second highest carbon dioxide emissions per capita per day, and 52 per cent of the world's desalinated water is produced in the Gulf countries,” said Mohammed El Ramahi, associate director at Masdar. "Our aim is to improve energy efficiency for desalination plants and have all of them 100 per cent powered by renewable energy in the long run.”
The type of renewable energy that will be used for the pilot desalination plant has not been disclosed yet, but Masdar explained that until the end of the year, the four teams will work on the technology to be used, trying to reach the perfect balance between technology and cost.
"We need to work on pilot technology to make sure the project will work. While on this trial period, the desalination plant will function on conventional energy to minimise costs. As we progress with technologies, we will perform simulations to make sure the costs are kept low,” explained Ramahi. "We hope to achieve 60 per cent of the current water unit cost in Abu Dhabi.”
Masdar hopes to commence production of the renewable energy desalination plant for a trial period from January 2015 to June 2016. At the end of this trial period, Masdar will choose to go forward with the technology of one of its four partners, or even all of them if all prove successful. "I believe this could be a revolutionary technology and we plan to commercialise it regionally and internationally.”
With the UAE's increasing water scarcity as the demand increases with the growth in population and economy, desalination plants keep increasing production, but it comes at the cost of our environment.
"According to the UN, over 40 per cent of the global population is affected by water scarcity, and by 2025, 1.8 billion people will live ... (with) ... water scarcity,” said Razan Khalifa Al Mubarak, secretary-general of EAD.
In the UAE, already 30 per cent of the water supply comes from desalination, while the ground water only supplies 55 per cent and the rest of 5 per cent comes from recycled water.
EAD is working on creating two underground water reservoirs — one in the Western Region and the other in Al Ain — which will be used in the future in case of crises.
Source: Khaleej Times

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

desalination plants to run on renewable energy in abu dhabi desalination plants to run on renewable energy in abu dhabi

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

desalination plants to run on renewable energy in abu dhabi desalination plants to run on renewable energy in abu dhabi

 



GMT 15:46 2018 Wednesday ,12 December

Festive Fashion by Dubai-based designer ASMARAÏA

GMT 17:43 2016 Monday ,15 August

Libya forces press assault on last Daesh positions

GMT 09:32 2018 Wednesday ,12 December

Huawei CFO gets bail; China detains ex-Canadian diplomat

GMT 19:48 2016 Friday ,01 January

Rwandan president announces he will seek third term

GMT 20:46 2017 Tuesday ,14 March

French probe opened into 2016 Vegas trip by Macron

GMT 10:13 2017 Saturday ,04 November

Britain, US oppose Russian bid

GMT 06:03 2017 Wednesday ,30 August

Egypt, Belarus FMs confer on bilateral ties

GMT 13:09 2017 Monday ,20 February

Refuses to convert his novel to unethical one

GMT 15:38 2017 Tuesday ,28 March

Erdogan urges quick EU decision on membership bid
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday