worlds longest rail tunnel set for grand opening
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

After the initial design was conceived

World's longest rail tunnel set for grand opening

Arab Today, arab today

Arab Today, arab today World's longest rail tunnel set for grand opening

More than 28 million tonnes of rock had to be excavated from the mountain
Erstfeld - Arab Today

The world's longest train tunnel will officially open on Wednesday, nearly seven decades after the initial design was conceived.

Switzerland's 57-kilometre (35-mile) Gotthard Base Tunnel runs under the Alps from Erstfeld in the central canton of Uri, to Bodio in the southern Ticino canton.

The rough design for a rail tunnel under the Gotthard Pass was first sketched by Swiss engineer Carl Eduard Gruner in 1947.

But bureaucratic delays, concerns over the cost and other hurdles pushed back the start of construction until 1999. 

Seventeen years and more than 12 billion Swiss francs ($12 billion, 11 billion euros) later, the Gotthard Base Tunnel is set for its inaugural journey.

German Chancellor Angela Merkel, French President Francois Hollande and Italian Prime Minister Matteo Renzi, along with Swiss officials, are due to be on board for the ceremonial first run.  

When the full service opens in December, the tunnel will shave the train journey from Zurich to Milan in northern Italy down to two hours and 40 minutes, roughly an hour less than it currently takes.
The new route also aims to make rail freight more efficient -- partly by supporting heavier cargo, which should reduce the number of diesel-guzzling lorries on the roads, improving traffic and curbing pollution.

The number of daily rail passengers is expected to increase from the current rate of 9,000 people to 15,000 by 2020, according to the Swiss federal railway service.

European Union transport commissioner Violeta Bulc last week described the new tunnel as a "godsend for Europe" which will serve as a "a vital link connecting Rotterdam (and) Antwerp with the ports of the Adriatic".

The Gotthard project was largely made possible by technical advances in tunnel-boring machines, which replaced the costly and dangerous blast-and-drill method. 

The primary machine used to make the Gotthard tunnel was roughly 410-metres long and functioned like a mobile factory. 

It cuts through rock and throws the debris backwards while simultaneously placing the pre-formed segments of concrete that form the shape of the tunnel.

A separate system grouts the pieces together.

According to the Swiss rail service, it took 43,800 hours of non-stop work by 125 labourers rotating in three shifts to lay the tunnel's slab track. 

When it officially opens, the Gotthard will surpass Japan's 53.9-kilometre Seikan tunnel as the world's longest train tunnel.

The 50.5-kilometre Channel Tunnel that links England and France will be bumped into third place.

Source: AFP

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

worlds longest rail tunnel set for grand opening worlds longest rail tunnel set for grand opening

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

worlds longest rail tunnel set for grand opening worlds longest rail tunnel set for grand opening

 



GMT 21:52 2017 Thursday ,19 October

Israeli forces arrest 7 Palestinians in West Bank

GMT 15:41 2017 Wednesday ,04 October

Putin warns against double standards in war on terror

GMT 23:42 2017 Monday ,18 September

Mattis 'shocked' by low level of US military readiness

GMT 17:36 2017 Saturday ,14 October

What's at stake for business in Iran's nuclear deal

GMT 14:14 2017 Saturday ,11 February

Ghada Adel praises participation with Adel Imam

GMT 21:00 2017 Thursday ,05 October

Scores of settlers storm into Al Aqsa

GMT 11:56 2017 Wednesday ,29 November

Iraqis throng to Picasso in Baghdad

GMT 05:43 2018 Wednesday ,12 September

"Ala" Syria determined to liberate Idleb from terrorism

GMT 19:47 2018 Thursday ,18 January

Sultan Al Qasimi launches Sharjah real estate projects

GMT 10:58 2017 Thursday ,20 April

Kabbara meets Saudi counterpart, IMO chief in Cairo

GMT 00:10 2017 Tuesday ,10 October

Turkey calls for new round of Syria talks in Geneva

GMT 00:29 2017 Tuesday ,24 October

HM King congratulates UN secretary-general

GMT 10:42 2017 Monday ,22 May

Egypt refers 48 IS suspects to military court
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday