modon inks sr700m electricity deals to spur investment
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

Establish integrated serviced industrial cities

Modon inks SR700m electricity deals to spur investment

Arab Today, arab today

Arab Today, arab today Modon inks SR700m electricity deals to spur investment

Tawfiq Al-Rabiah, minister of commerce and industry and chairman of Modon board  
Jeddah - Arabstoday

Tawfiq Al-Rabiah, minister of commerce and industry and chairman of Modon board   Modon’s has signed new contracts, worth SR700 million, to build electricity transmission plants and aerial and ground power supply lines for five industrial cities.Tawfiq Al-Rabiah, minister of commerce and industry and chairman of Modon’s board of directors,signed the contracts in the
   presence of Saleh Al-Rasheed, director-general of Modon, and executives from Modon and the executing companies.
This is the largest among Modon's projects that provide electric power for five industrial cities under development, thus achieving Modon's Strategy to establish integrated serviced industrial cities.
The first contract, valued at SR310 million with execution period of 26 months, was signed with the Arab Company for Electric Equipment. It provides for the construction of a central transmission plant, voltage 380/115/13.8 kV in Dammam's third Industrial City with a total capacity of 500 mega. v/ampere.
The project includes the following works:
A set of switchgears, transformers, supply and installation of capacitors, supply and installation of (1) one reactor and all civil works and supporting facilities that are needed for the establishment of the plant building. Supply and installation of all equipment necessary for remote control, protection, communications and transfer of information (SCADA).
The Saudi Electricity Company will link the new central plant of 380 kV by establishing the lines.
The second contract, signed with Al-Jehaz Contracting Company, is valued at SR260 million.
It has an execution period of 26 months and includes the establishment of a 380/110/13.8. kV central transfer plant in Jeddah’s Third Industrial City at a total capacity of 500 mega v/ampere.
The project includes the following works: Set of switchgears, supply and installation of transformers, compensation equipment of non-effective power and capacitors, all civil works and supporting facilities needed for the establishment of the plant building.
Linking the new plant with a 110 kV aerial line, extended between Al-Shuaiba and Jeddah Second Industrial City. Supply and installation of all equipment necessary for remote control, protection, communications and transfer of information (SCADA). The Saudi Electricity Company will link the new central plant of 380 kV by establishing the necessary aerial lines of 380 kV.
The third contract, valued at SR260 million, was signed with Delta Contracting Company with an execution period of 26 months. It includes the establishment of a 132/13.8 kV central transfer plant for Sudair City for Industry and business at a total capacity amounting to 120 mega kV/ampere.
The project includes the following works:
Set of switchgears, supply and installation of transformers, capacitors, and all civil works and supporting facilities needed for the establishment of the plant building, expansion of the switchboard, and voltage of 132 kV in the existing plant No. 9011 with two switches to link the proposed aerial line. Supply and installation of all equipment necessary for remote control, protection, communication and transfer of information (SCADA) in the plant No. 9011, and the existing plant No. 8506 at Sudair Industrial City and the proposed plant.
The fourth contract was signed with the Saudi Company for Electrical Services. It is valued at SR51 million and has an execution period of 24 months.
It provides for the setting up of 40 km long 132 kV double circuit aerial line, with around 1.5 km long ground cables from the existing plant No. 9011 to the proposed plant in Sudair City for Industry and Business. Around 4 km long 132 kV ground cables will link the proposed plant to the existing plant in the Sudair Industrial City No. 8506.
The fifth contract was signed with Al-Jehaz Contracting Company. It is valued at SR8,856,380 with an execution period of 7 months for the implementation of 13.8 kV distribution network in Jazan Industrial City.
The contract includes the design works and execution of 13.8 kV electrical distribution network, including  erection of 17 km long 15 kV (3*300 sq mm) copper cables and conducting all tests and inspections for all the works and fixtures.
As well as the sixth contract signed with FADAC Global Contracting  Company valued at SR8,424,600 with an execution period of 7 months for the implementation of a 13.8 kV distribution network, in Riyadh Third Industrial City (Ha'ir).
The contract includes the design works and execution of 13.8 kV electrical distribution network, including erection of a 14 km long 15 kV. (3*300 sq.mm) copper cables, and conducting all tests and inspections required for all the works and fixtures.
The director-general said Modon's next project will focus on the completion of services and infrastructure, so that the existing industrial cities that are under development become integrated services cities.

 
 

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

modon inks sr700m electricity deals to spur investment modon inks sr700m electricity deals to spur investment

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

modon inks sr700m electricity deals to spur investment modon inks sr700m electricity deals to spur investment

 



GMT 12:11 2017 Thursday ,27 July

Tony Baroud to present new TV show

GMT 23:00 2017 Monday ,16 October

Egypt FM to head for Slovenia on Monday

GMT 20:06 2017 Friday ,20 January

Daesh in new demolitions at Syria’s Palmyra

GMT 21:06 2017 Friday ,24 November

Marriyum condemns Hayatabad terrorists attack

GMT 01:00 2017 Saturday ,25 November

Cabinet Affairs Minister Meets Indonesian Ambassador

GMT 02:34 2018 Thursday ,04 January

Merger creates state-owned gas giant

GMT 10:08 2017 Tuesday ,07 March

Geneva farce: The regime is the opposition

GMT 10:19 2017 Saturday ,18 November

AJK Prime Minister condemns across LoC shelling
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday