The Gaza Strip’s only functioning power plant was out of action Sunday after running out of fuel, the head of the territory’s electricity provider told AFP.
Samir Metir said that all the plant’s fuel, purchased with funding from Qatar and Turkey, had been used up.
He said it was not clear when the Palestinian territory would receive more, owing to a “dispute” between the electricity authority in Gaza and Palestinian authorities in the West Bank.
The Hamas movement seized power in Gaza in 2007 from the Ramallah-based Fatah organization of Palestinian President Mahmud Abbas.
A mooted power-sharing agreement in the Strip has failed to materialize, and Gaza residents have been subjected to a decade-long Israeli blockade severely limiting supplies.
Fuel supply for the Strip’s two million inhabitants has been a long-running source of dispute, with most homes in Gaza receiving two eight-hour periods of electricity a day even when the plant is operating normally.
Protests broke out in January over the power shortages, which the Gaza Health Ministry warned could have “dangerous consequences” for patients.
As things stand, residents can expect two six-hour periods of electricity, Metir said, “including electricity bought from Israel and Egypt.”
Source: Arab News
GMT 23:51 2017 Friday ,24 November
High A- rating for proposed Qidfa power plant bondGMT 09:47 2016 Tuesday ,22 November
New York moves closer to shutting down Indian PointGMT 22:12 2016 Wednesday ,05 October
Saudi Electricity awards France’s Engie $1.2bn power station contractGMT 16:25 2016 Tuesday ,24 May
China to build 1st nuclear power plant in SudanGMT 20:11 2016 Sunday ,15 May
Ship carrying turbines for new power plant arrives at Burullus portMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor