fukushima operator restarts water decontamination system
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

Fukushima operator restarts water decontamination system

Arab Today, arab today

Arab Today, arab today Fukushima operator restarts water decontamination system

Tokyo - AFP

The operator of Japan's crippled Fukushima nuclear plant said Monday it has switched on a key decontamination system that cleans radiation-tainted water used to cool the site's damaged reactors. Last week, Tokyo Electric Power (TEPCO) said it had discovered a defect in its Advanced Liquid Processing System (ALPS) and switched it off for repairs. The embattled firm said two of three lines that clean the toxic water were running again as of Monday afternoon. A third line remained offline while workers tried to fix a filter defect which had prevented proper decontamination. The problems meant supposedly purified water still had a large amount of strontium -- produced during nuclear reactions -- which accumulates in the bones and can cause several types of cancer in humans. Company officials said there was no immediate safety risk, but added that the poorly-filtered water would have to be cleaned again. It was not the first time the utility has switched off the system, which has been hit by a series of glitches since trial operations began a year ago. TEPCO is struggling to handle a huge -- and growing -- volume of contaminated water at the tsunami-damaged plant. There are about 436,000 cubic metres of contaminated water stored at the site in about 1,200 purpose-built tanks. Many experts say that at some point the water will have to be released into the sea after being scoured of the most harmful contaminants. They say it will pose a negligible risk to marine life or people, but local fishermen and neighbouring countries are fiercely opposed.

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

fukushima operator restarts water decontamination system fukushima operator restarts water decontamination system

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

fukushima operator restarts water decontamination system fukushima operator restarts water decontamination system

 



GMT 15:19 2017 Wednesday ,08 November

A well changes lives in ravaged Mali city

GMT 17:54 2018 Friday ,12 October

Florida town demolished by Hurricane Michael

GMT 02:59 2016 Tuesday ,20 September

Indian markets open flat

GMT 08:04 2017 Thursday ,19 October

Jordan condemns Mogadishu blasts

GMT 02:03 2017 Wednesday ,12 July

Egyptian police raid Al Jazeera unit again

GMT 15:25 2017 Tuesday ,21 November

Ratings boost for Saudi reform program

GMT 21:45 2017 Saturday ,21 January

Trump demands CIA to eliminate ISIS in Syria

GMT 13:19 2017 Wednesday ,29 March

Belstaff appoints Karla Otto
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday